16th August 2017 at 10:47 pm
#1432
Dave
Participant
I got Eon to install a non smart E10 meter and within 2 days switched to Together energy E10 ( it takes 21days). I re read the letter from Eon only implies you have to have a smart meter fitted, it just does not mention the standard E10 meter. Together energy rates are much lower than Eon for E10.